|
|
|
One of the world’s leading container shipping companies appointed DWA to undertake a pre-feasibility study for a container terminal in Panama.
The proposed terminal has 650m of quay length and 60 Ha of supporting container storage. It is accessed through a 1,800 km long approach channel cut through coral and capable of accept super post panamax container ships.
The study included cost estimates and due diligence reviews of the site which is currently owned and operated by a Panamanian developer. |
|
|
|
|
|